In the project, there are a total of 126 apartments and 10 Villas, including 1+1, 2+1, 3+1 and Villas, ideally-usable balconies in each apartment for your dream life, and pleasant garden floors that offer more usage space than many construction projects in Antalya.
You can get information about the prices of other apartments from the “Property Documents” section or “Property Plan” tab.
SOCIAL FINANCES:
- Indoor parking (a parking space is allocated for each flat)
- Open parking lot
- Olympic swimming pool
- Basketball playground
- Football field
- Tennis court
- Fitness area
- Cinema
- Children’s swimming pool
- Aquapark
- Playground
- Sauna / Steam room
- Cafe / Bar
- Camellia
- Barbecue area
- Chess
- Reception
- 24/7 security and video surveillance
TECHNICAL CONDITIONS:
- Indoor parking will be allocated for each flat.
- Panoramic glass elevator will be installed.
- Double sound insulation will be used between apartments.
- The reinforced concrete carcass of the building will be constructed according to the new earthquake regulation.
- Foundation irons and floor irons will be used in the features and dimensions specified in the static project.
- Concrete samples will be made for each floor and iron will be checked.
- The construction will be controlled by building inspection companies.
- Insulating bricks or pumice bricks will be used to provide insulation on the outer walls.
- Interior walls and ceilings will be gypsum plaster on rough plaster, the top coat will be satin plaster and plaster board will be applied.
- Exterior walls will be painted with TSE certified paint.
- Hebeschiebe aluminum joinery will be used.
- Insulated and comfortable glass will be used.
- Star integrated MDF lam will be used.
- Balcony railings will be glass or aluminum.
- Window sills and door sills will be marble.
- Residential stairs will be marble. The steps will be 3 cm thick and the piers will be 2 cm thick. Housing entrance and elevator edges will be marble or ceramic.
- Underfloor heating (pilsa) system will be built.
- A garden wall will be built around the residence in accordance with the project.
- Roof covering will be detailed in accordance with the project.
- Kitchen cabinets will be workshop production. Project planning and selection will be made according to the location.
- Kitchen countertops are granite or etc. material will be.
- Interior doors will be lacquered framed laminate doors. Lock and other accessories will be 1st class TSE certified.
- Steel door – wing front and rear surfaces, 1st class CNC machined lacquer painted frame system, A symmetry concealed screwing that cannot be interfered with from the outside
- The floor of all rooms and the hall will be laminated parquet or ceramic and will be skirting, the material to be used will be material suitable for TSE and human health. The material used will be 1st class.
- Waste water pipes and rain water pipes will be thick series and have a wall thickness of 3.2 mm.
- Silk matte lacquered furniture will be used.
- Vitra – Artema built-in bathroom will be used.
- Vitrified materials will be TSE certified.
- Bathroom closets will be fitted with TSE certificate.
- All fixtures will be TSE certified.
- Bathroom and WC ceramics will be TSE certified.
- CERAMIC will be applied in corridors, kitchens and entrances.
- Floor drains will be placed on bathrooms, balconies and WCs.
- Tile edge strips will be placed on ceramic corner joints.
- Heating pipes will be suitable for the project.
- All fuses and conditions to be used in the electrical installation will be TSE certified.
- The electrical cables to be used in the installation will be TSE certified.
- Telephone and TV installations will be installed in the place and number specified in the project.
- Silent plumbing pipes
- Each residence will have a cloakroom.
- Surrounding security cameras will be installed.
- automatic blinds
- The switches and sockets to be used will be TSE certified.
- Basic grounding will be done by competent persons in accordance with the regulations.
- Intercom system will be TSE certified
- Bosch brand 3 built-in set will be installed
- Franke countertops will be used.
- Furniture parts (door + kitchen) manufacturing and material quality will be of the same quality as the materials used by the contractor company for their villas.
- At the end of the construction, the floor of the parking lot will be made of a keystone.
For more information please contact us
Property Documents